FRP Stairway Cooling Tower Parts

Product Details
Place of Origin: China
Brand Name: HOHD
Certification: ISO
Model Number: HOHD
Payment & Shipping Terms
Minimum Order Quantity: Negotiation
Price: Negotiation
Packaging Details: According to customer’s requirment
Delivery Time: 7-15days
Payment Terms: L/C T/T,Paypal
Supply Ability: 100 Set/Sets per Week

Detail Information

Product Description

 

FRP Stairway Cooling Tower Parts

 

 

Quick Detail:

 

The manufacturing process for FRP product consists of 7 processes: Raw materials preparation, Mold preparation, Hand paste molding, Solidify, Take off the mold, Disposal, Inspection (see the diagram as below). Each Technique has to be conducted according to the Operation Manuel.

 

 

Specifications:

 

MODEL

Total Max Width

Total Max Height

Width of per step

Height of per step

Width of non-slip surface

Width of top  non-slip surface

Max

840mm

1980mm

228mm

220mm

120mm

100mm

The height could be adjusted by client’s requirement.

 

 

Description:

 

  1. Molding Condition:

     To assure the quality of the accurate FPR product, the molding should be under flowing conditions:

  • keep a constant temperature between 15 to 25℃ in the FPR molding workshop.
  • keep the humidity under 75% in the workshop too.
  1. Raw materials Preparation

     The raw materials used for FRP product are as follows:

  • Fiberglass fabric and Fiberglass Felt
  • Resin
  • Coating
  1. Mold Preparation
  • Make the fiberglass mold according to the inner shape of the product and the precision requirement.
  • Make sure it is smooth and no default on the surface.
  1. Hand Paste Molding Technique
  • Spray resin coat by American Douglas coat spray machine on the surface of the mold.
  • Pre-make the reinforced bar according to drawings.
  • Put the pre-make reinforced bar in the right place, and wrap it with fabric until it gets to the designated depth.
  • Examine if the edge is leaking and it still has bubbles after pasting.
  1. Solidity
  • Make sure the solidify temp. is 25%±3℃, the humidity not above 80%(The workshop must be thermostatic and desiccative.)
  • The mold cannot be taken off until it has been solidified for 10 hours (solidifying temperature 25±3℃) and the degree of cure has reached 80% ( Barcol rigidity> 41).
  1. De-molding
  • Push the mold out, prize and press are not allowed.
  • Put the De-molding product on the soft fabrics and then move to the designated place in case distortion or abrade.
  1. Final disposal
  • Get rid of the thorn, bubbles on the surface, spray resin after the cleaning job.
  • Cut the edge according to the design requirements.

 

 

Applications:

 

For maintenance

 

 

Competitive Advantage:

 

1.Non-slip and firmly

2.Convenience for Maintainence

3.Long life

4.Ageing Resistance and Ultraviolet

 

 

Want to Know more details about this product
Please enter your inquiry details.
Similar Products
Pultruded FRP Online Market
cschenli@maoyt.com
86-010-87827984-11
Room 501, unit 6, building 20, North Lane, east flower market, Beijing
Leave a Message
*Email
*Message
Send
China Good Quality Temperature Control Units Supplier. Copyright © 2014-2025 closedcoolingtowers.com . All Rights Reserved.